How to Design a Stone Crusher Plant Layout

Stone Crusher Plant Layout

The essential objective of designing a stone crusher plant layout is to ensure setting up the machine meets the preferred production requirements, complies with environmental regulations, and operates with a competitive cost. You should think about the following industry trends before planning the design. • Many equipment suppliers are now providing large primary crushers with 1800 mm gyratories and secondary crushers with tertiary machines with size as much as 3000 mm. • The increased energy pricing is creating the integration of mill and mine designs. This allows them to identify different methods of reducing power consumption. • The electrical control over a

jaw crusher

may now adjust the crusher’s discharge opening. You may open the discharge area during production to examine the coarse measurements of the crushed product. • Stone crusher manufacturers are actually paying more attention on crushing circuit design that can help identify moisture content, climatic conditions, ore grade, size distribution, and ore characteristics. • Designers are actually adding both primary and secondary pebble crushers to SAG circuits. This assists the equipment increase its feed rate to the SAG mill. Designing a layout A stone crusher plant designer follows three steps to generate the design: • Process design • Equipment selection • Layout The main design parameters driving the crushing plant and configuration includes the next:• Capital cost • Production requirements • Maintenance requirements • Ore characteristics • Safety and environment • Operational considerations • Project location • Life of mine and expansion plans • Climatic conditions The production requirement flowsheet specifies the stone crusher plant layout’s peak production flow rate, equipment size, and production flow rate. Manufacturers provide equipment ratings according to experience and testwork. Therefore, a production requirement flowsheet contains tonnage requirements and the kinds of equipment the layout must have. Additionally, you should also think about the mine haul-truck capacity. It is very important for primary crusher installations. As an example, if the primary crusher’s dump pocket is struggling to handle the mine’s trucks,then operators should slow the meter ore in to the receiving hopper. Ore characteristics Ore characteristics are very important to the plant design layout and crusher selection. Dry ores usually require greater provisions for collection and dirt suppression. Additionally, additionally, they need dust enclosures around their screens, vacuum and wash-down systems, and sealing on conveyor belts. However, wet and sticky ores helps to reduce surge capacity, plug chutes, and reduce the live storage capacity of silos and bins. Once you design the design, you must ensure that the chutes are often appropriate for cleanup. Most of all, the feeder openings ought to be large enough for silos, tunnels, and bins. Ore characteristics may change after a while. However your layout must be flexible enough to manage those changes.You must be able to make design modifications later and ensure that the ores can squeeze into the

crusher machine for sale

easily. Designing a stone crusher plant layout is pretty complicated. You need expertise in this field and acquire knowledge of how different plants work to successfully design a layout.